Before a data center design decision can be taken, all the
key stakeholders must be considered, these include:
-
The C Class people
-
Stakeholders
-
Customers
-
Staff
-
Suppliers
Client Brief:
-
IT capacity ramp up over
asset life
-
Incremental while space fit
out / modular concepts.
-
M&E Resiliency
Requirements.
N+1 or 2N same of each compartment /room?
-
Telco Resiliency Requirements.
-
Technologies to be
implemented.
-
PUE Target.
Planning Phase:
-
Consultants are appointed.
-
Crucial decisions are made.
-
The design intent document
is established
-
The cost plan is determined
-
The project timeline is
established
-
The client brief is signed
off
-
Funding approval and
budgets are agreed
-
Regulatory planning and
codes consent are applied for
-
IT equipment delivery,
Storage and installation plan is created.
Design Phase:
-
The main contractor is
appointed
-
The entire project team is
identified
-
The system to be
commissioned are determined
-
An architectural review of
room building is conducted
-
A need assessment
/inventory of IT requirements is performed.
-
The design intent
documentation is submitted
-
IT, facilities and
architecture are reviewed.
-
The scope of work for all
participants, including contractors and vendors is reviewed.
-
The utility providers are
established
-
The commissioning plan is
produced
-
The IT infrastructure and
network design is agreed.
Build Phase
-
Appoint M&E
Contractors.
-
Commissioning consultants
define acceptance criteria
-
Milestone monitoring is
performed
-
User acceptance testing at
manufacture’s site
-
Pre-functional testing is
completed as required.
-
Site inspections and
progress reports are submitted.
-
Design modifications documented
and approved
-
Change order process and
approval authority are monitored
-
Suppliers train M&E
Operational staff.
-
Commissioning phase.
Construction Phase Handover:
-
Equipment suppliers submit
O&M documentation to main contractor.
-
M&E contractors’ staff
carries out acceptance test in conjunction with contractors.
-
On site functional
performance and integration testing.
-
Site /Equipment audit –
M&E Asset list prepared.
-
Manufacturer warranty
audit.
-
Health & Safety plan
submitted including residual risks.
-
Final documentation
submittal including ‘As built’ drawings and test results.
-
Change over temporary
utility supplies to permanent.
Post Construction Handover – Client Handover Phase
-
O&M procedures
established – Standard Operation Procedures SOP, Emergency Operation procedures
EOP and Planned Maintenance Procedures PMP
-
IT equipment installed.
-
Document storage and
document modification process defined.
-
M&E personnel testing
and assessment
-
Moves, Adds and changes
procedures established.
-
Change control procedures
and policies implemented.